Geotechnical Drilling Project
State Highway 71, Bastrop, TX
July 2025
Project Overview
IET completed geotechnical soil boring services at a site on State Highway 71 in Bastrop, Texas. The project involved collecting undisturbed soil samples using Shelby tube sampling methods to assess subsurface conditions for engineering design purposes.
Services Performed
- Soil borings to 40 feet depth (70 linear feet total)
- Thin wall Shelby tube sampling
- Sample capping and sealing
- On-site mobilization and setup
Project Details
Completion Date:
July 15, 2025
Total Depth:
70 linear feet
Sampling Method:
Thin Wall Shelby Tubes
Client:
Colliers Engineering
Key Features
- Undisturbed soil sample collection for geotechnical analysis
- Professional sampling techniques ensuring sample integrity
- Efficient mobilization and project execution in Texas