Multi-Component Investigation

Hart & Hickman contracted IET for a comprehensive three-component assessment at the Kwiklean dry cleaning facility, including permanent wells, soil borings, and vapor investigation.

4
Permanent Wells
6
Soil Borings
3
Soil Gas Points
Permanent Well Installation

Configuration: Four 2" flush-mounted monitoring wells

Depth: Approximately 25 feet (10 ft screen sections)

Completions: Manholes with 2' x 2' concrete pads

Total Well Material: 65 linear feet

Services: Complete well development included

Soil Gas Investigation
  • • Three temporary soil gas points to 6 feet
  • • Hand auger advancement for sample collection
  • • Soil samples collected from gas point locations
  • • Interior and exterior installations
Project Execution

Client

Hart & Hickman, PC (Job No. DSO-181A-D)

Project Manager

Colin Carraway, PG

Duration

January 15-18, 2024 (3 days)

Total Cost

$10,700

Special Requirements

Concrete coring, hand augering upper 5 ft, IDW drumming

IDW Management

8 drums of soil/water waste containerized