DPT & Hollow-Stem Auger Project
1035 Mecklenburg Highway, Charlotte area, NC
November 12-14, 2025
Project Overview
IET completed a comprehensive drilling investigation combining direct push technology (DPT) and hollow-stem auger drilling methods. The project included installation of five temporary 2-inch monitoring wells to 40 feet, soil borings both inside and outside a building, concrete coring, and subsequent well abandonment—all completed with hand-clearing of each location.
Services Performed
- Five 2" temporary monitoring wells to 40 feet (235 linear feet)
- Hand clearing to 5 feet using decontaminated auger
- Two soil borings to 15 feet inside building
- Concrete coring for interior access
- Complete well abandonment services
Project Details
Completion Date:
November 12-14, 2025
Project Duration:
3 days (2-man DPT crew)
Total Depth:
235 linear feet drilled
Client:
Hart & Hickman, PC
Key Features
- Multi-method approach combining DPT and hollow-stem auger drilling
- Interior building investigation with concrete coring capabilities
- Complete turnkey service from installation to abandonment
- Proper decontamination protocols between boring locations