Zionsville Three-Zone Treatment Program

Zionsville, IN
March 2018
Former DOW Site
Three-Zone Treatment Strategy

An environmental consulting firm contracted IET for comprehensive remediation of a former industrial research site. The program featured three distinct treatment zones: unsaturated EZVI, electron donor permeable reactive barrier, and downgradient Area C amendments.

Treatment Zones

Unsaturated EZVI Area (14 days)

• DPT rig, injection trailer, and crew — 14 days of continuous operations
• Material handling, supervision, per diem, and forklift included
• Nitrogen pressurized delivery system

Electron Donor PRB (10 days)

• DPT rig, injection trailer, and crew — 10 days of operations
• Material handling, supervision, per diem, and forklift included
• Nitrogen pressurized delivery

Downgradient Area C (2 days)

• DPT rig and injection trailer — 2 days targeted operations
• ZVI, electron donor substrate, nutrient, and propionate amendments
• Material handling and supervision included
Project Details

Client

Environmental Consulting Firm

Location

Zionsville, Indiana

Completion Date

March 2018

Duration

26 days on-site (14 + 10 + 2 zones)

Mobilization

Full equipment mobilization included

Technologies

EZVI, Provect-IR PRB, ZVI amendments