How a scope becomes a rig on your site

Dispatch is the part of a remediation or drilling job nobody photographs: the method call, the gear call, the insurance certificate, the utility locate. Getting it right is the difference between a crew on site Monday and three weeks of questions.

Five regional desks · one process · a named contact at every office.

A call back the same day

Scopes that arrive before mid-afternoon get a method and gear answer the same business day, and a schedule within one.

One dispatcher owns it

From the first email to demobilization you deal with the same desk, not a call center that needs the story again.

Nothing lost in email

Scopes, logs, lab data and insurance all land in one file per job — which is also why the documents list below is short and specific.

How a job moves through dispatch

Four steps, one owner. The same sequence runs at every IET office, which is why a scope that reads well in Fort Worth reads the same way in Sunbury.

  1. 1

    The scope comes in

    A scope of work, a site plan, boring logs or a lab table — by email, phone or the South Carolina upload form. One clear page is enough to start; dispatch will ask for the rest.

  2. 2

    Method and gear call

    The desk matches the site to a treatment approach and the right rig or injection spread: direct push versus hollow stem, persulfate versus an electron donor, soil mixing versus recirculation.

  3. 3

    Documents and clearance

    Insurance, the health and safety plan, utility locates, access and permits are collected and checked before anything rolls. This is where most schedule surprises are caught.

  4. 4

    Crew, schedule, mobilization

    You get a schedule, a mobilization plan and one named dispatcher who owns the job from the first call to demobilization — not a queue of people who each need the story again.

Documents that make a job go smoothly

None of this is paperwork for its own sake. Each item answers a question a driller, a regulator or an owner will ask on site — and every missing one is a day.

About the site

What dispatch needs to pick a method and a rig.

  • Site plan or figure with the work limits drawn on it
  • Boring logs, well construction details or cross sections
  • Lab data and chain-of-custody forms
  • Contaminants of concern and the cleanup standards that apply
  • Depth to water, geology notes and any known obstructions

Before mobilization

What has to be in hand before a crew can start.

  • Utility locate (811) ticket and any private locate results
  • Access agreement, gate codes, staging and parking area
  • Drilling, discharge or road permits the job requires
  • Disposal facility and waste profile requirements
  • Site-specific HASP, or IET’s HASP for review and sign-off

On paper

What keeps the schedule and the invoice moving.

  • Certificate of insurance with any additional-insured wording your contract requires
  • Vendor prequalification packet, if your organization uses one
  • Purchase order, contract or letter of authorization
  • Billing contact, PO number and invoicing instructions

Start with the desk that owns the ground

South Carolina has its own contractor desk with a scope upload form, method sheets and gear sheets. The other four desks take scopes by phone and email, and hand off between regions without making you repeat yourself.