Dispatch
How a scope becomes a rig on your site
Dispatch is the part of a remediation or drilling job nobody photographs: the method call, the gear call, the insurance certificate, the utility locate. Getting it right is the difference between a crew on site Monday and three weeks of questions.
Five regional desks · one process · a named contact at every office.
A call back the same day
Scopes that arrive before mid-afternoon get a method and gear answer the same business day, and a schedule within one.
One dispatcher owns it
From the first email to demobilization you deal with the same desk, not a call center that needs the story again.
Nothing lost in email
Scopes, logs, lab data and insurance all land in one file per job — which is also why the documents list below is short and specific.
How a job moves through dispatch
Four steps, one owner. The same sequence runs at every IET office, which is why a scope that reads well in Fort Worth reads the same way in Sunbury.
- 1
The scope comes in
A scope of work, a site plan, boring logs or a lab table — by email, phone or the South Carolina upload form. One clear page is enough to start; dispatch will ask for the rest.
- 2
Method and gear call
The desk matches the site to a treatment approach and the right rig or injection spread: direct push versus hollow stem, persulfate versus an electron donor, soil mixing versus recirculation.
- 3
Documents and clearance
Insurance, the health and safety plan, utility locates, access and permits are collected and checked before anything rolls. This is where most schedule surprises are caught.
- 4
Crew, schedule, mobilization
You get a schedule, a mobilization plan and one named dispatcher who owns the job from the first call to demobilization — not a queue of people who each need the story again.
The five dispatch desks
Each office runs its own desk with a named contact, its own coverage and its own gear — so the person answering already knows the ground you are working on.
Piedmont, SC
Upstate dispatch for South Carolina, north Georgia and western North Carolina, with scope uploads and method and gear sheets built for state contractor work.
Randy Phillips
VP, Southeast Drilling Operations
864-979-8166Rockwell, NC
The Carolina desk for Piedmont, Sandhills and Coastal Plain work — soil borings, well installation and injection support.
Michael Tynan
North Carolina Operations Manager
888-721-8283Fort Worth, TX
Gulf Coast and North Texas dispatch for air rotary, barge-mounted rigs and monitor well programs on tight urban sites.
William Fields
Texas Operations Manager
888-721-8283Pipersville, PA
The remediation desk at headquarters, handling every remediation project in the region — chemical oxidation, chemical reduction, bioremediation, soil mixing and metals stabilization, matched to the site rather than to a single method.
Denise Pollock
Office Manager
888-721-8283Sunbury, OH
The Midwest remediation desk, handling every remediation project in the region — manufactured gas plant, chlorinated solvent, petroleum and metals sites — from treatability testing through full-scale treatment.
Wade Meese
Vice President
740-965-6100Documents that make a job go smoothly
None of this is paperwork for its own sake. Each item answers a question a driller, a regulator or an owner will ask on site — and every missing one is a day.
About the site
What dispatch needs to pick a method and a rig.
- Site plan or figure with the work limits drawn on it
- Boring logs, well construction details or cross sections
- Lab data and chain-of-custody forms
- Contaminants of concern and the cleanup standards that apply
- Depth to water, geology notes and any known obstructions
Before mobilization
What has to be in hand before a crew can start.
- Utility locate (811) ticket and any private locate results
- Access agreement, gate codes, staging and parking area
- Drilling, discharge or road permits the job requires
- Disposal facility and waste profile requirements
- Site-specific HASP, or IET’s HASP for review and sign-off
On paper
What keeps the schedule and the invoice moving.
- Certificate of insurance with any additional-insured wording your contract requires
- Vendor prequalification packet, if your organization uses one
- Purchase order, contract or letter of authorization
- Billing contact, PO number and invoicing instructions
Start with the desk that owns the ground
South Carolina has its own contractor desk with a scope upload form, method sheets and gear sheets. The other four desks take scopes by phone and email, and hand off between regions without making you repeat yourself.
Translate