Chlorinated Solvents

Former Dry Cleaner

Durham, North Carolina
Project Data

Project Year

2014

Project Duration

24 months (pilot study)

Contaminants of Concern

PCE
TCE
DCE

Remediation Technologies Used

  • • Pilot-Scale Permeable Reactive Barrier
  • • Zero-Valent Iron (ZVI)
  • • In-Situ Chemical Reduction
  • • Passive Treatment System

Key Results

  • 99.74% PCE reduction achieved
  • Daughter product degradation documented
  • Pilot-scale validation successful
  • Long-term passive treatment demonstrated
  • Cost-effective solution for ongoing remediation
Project Summary

A pilot scale remedial event was conducted in Durham, NC at a former dry cleaner site to exhibit the efficacy of a proposed remedial design. The site was identified as having impacted soils and groundwater due to the historical use of tetrachloroethylene (PCE).

In April 2011, an 18' self-contained mobile injection trailer was used to deliver the remedial materials via permanent injection wells. Open rock wells were utilized to deliver materials from 30' to 40' and create a pilot scale permeable reactive barrier.

Contaminants of Concern
PCE
TCE
cis-1,2-DCE
Vinyl Chloride
Remediation Plan

The injection program consisted of three injection wells utilized to inject a mixture of remedial materials containing blue green algae, sodium sulfite, calcium propionate, zero valent iron, and soluble kelp.

A single inflatable TMA 350 packer system was used to inject the materials below 25' bgs. The remedial mixture was designed to be a pilot scale remedial action at the site to restrict plume migration while also reducing CVOC concentrations locally via enhanced reductive dechlorination.

The pilot scale program was designed to act as a proof of concept and promote anaerobic conditions in the groundwater, thereby enhancing bacterial populations within the anoxic groundwater.

Treatment Results (9 Months Post-Injection)

Monitoring well MW-26 is located within the pilot scale remedial treatment area, immediately downgradient of the three injection points and screened between 27-37.5 feet bgs.

MW-26 Results (January 2012):
  • Total CVOCs: 97.2% reduction (2,540 to 71.2 µg/L)
  • PCE: 99.74% decrease (2,400 to 6.2 µg/L)
  • TCE: 24.42% reduction
  • cis-1,2-DCE: 55.4% reduction

Vinyl chloride increased from below detection to 20 µg/L, which is normal as it is a byproduct of cis-1,2-DCE. Continued reductive dechlorination is expected in the pilot area.

Key Success Factors

97.2% total CVOC reduction
99.74% PCE reduction
Successful pilot-scale PRB
Open rock well injection method