Durham Washington Street Investigation

Durham, NC
January 2024
Mixed Investigation
Dual-Purpose Assessment

Hart & Hickman contracted IET for a rapid assessment combining groundwater monitoring well installation with soil boring investigation at 802 Washington Street in Durham.

Monitoring Wells

3 wells

1" PVC to ~15 ft depth

Soil Borings

Several

To 10 ft with continuous sampling

Well Construction Details
  • • Three groundwater monitoring wells
  • • 1" PVC screens and riser construction
  • • Depth to approximately 15 feet below grade
  • • Flush well covers with 2' x 2' concrete pads
  • • Soil cuttings spread on-site
Project Information

Client

Hart & Hickman, PC (Job No. AXR.001-001B)

Completion

January 29-30, 2024

Duration

1.25 days (rapid mobilization)

Total Cost

$4,574