Utility Infrastructure
Banks Street Substation Grounding
Fort Mill, South CarolinaMay 2025
Project Overview
IET completed a large-scale electrical grounding project for New Horizon Electric at the Banks Street Substation in Fort Mill, SC. This multi-day project involved installing and grouting eight borings with ground rods for critical electrical infrastructure safety.
The project totaled 694 linear feet of ground rod installation, requiring precision drilling and grouting to ensure proper electrical grounding for substation operations.
Installation Summary
Ground Rod Wells
694 linear feet installed and grouted for eight separate boring locations
Duration
Four-day project with two-crew deployment and per diem support
Technical Details
- • Client: New Horizon Electric
- • Site: Banks Street Substation, Fort Mill, SC
- • Completion Date: May 9, 2025
- • Number of Borings: Eight (8) ground rod installations
- • Total Depth: 694 linear feet installed and grouted
- • Project Duration: 4 days with multi-crew deployment
- • Project Manager: Zack Stringfield
- • PO Number: 9030