888-721-8283

Safe Harbor Pavement Assessment

Lewisville, TX
January 2024
Pavement Project
Pavement Geotechnical Study

Colliers Engineering contracted IET for a comprehensive pavement assessment requiring continuous SPT sampling, Shelby tube collection, and complete concrete coring/patching services.

9
Borings
90 ft
Total Depth
$4,408
Project Cost
Sampling Program

Continuous SPT Sampling

31 SPT tests at 5-foot intervals for first 10 feet of each boring

Shelby Tube Samples

5 undisturbed Shelby tube samples (3" x 30") with waxing and caps

Surface Work

9 concrete/asphalt cores with complete patching restoration

Project Information

Client

Colliers Engineering (Project# 23006982A)

Completion Date

January 30, 2024

Sales Representative

Randall Cutter

Site

Safe Harbor Pavement, Lewisville