Morganton Soil Gas Monitoring
Morganton, NC
February 2024
Vapor Investigation
Soil Gas Point Installation
Hart & Hickman contracted IET for specialized soil gas monitoring point installation at the SGMP Morganton site. The project required hand auger advancement with soil screening collaboration and concrete coring through paved areas.
3 points
Soil Gas Monitoring Locations
Installation Details
Point Construction
- • Depth: 6 feet below grade
- • Stainless steel hand auger advancement
- • Soil screening during advancement with H&H staff
- • Complete materials package (sand, bentonite, screens, tubing, caps)
Site Conditions
- • Concrete/asphalt coring required for access
- • Decontamination between each location
- • Stainless steel screens and Teflon tubing used
Project Information
Client
Hart & Hickman, PC (Job No. DSO-99)
Completion Date
February 20, 2024
Crew
2-person crew (1 day duration)
Total Cost
$2,357