NCDOT New Hope Road Project
North Carolina
January 2024
NCDOT Highway
Major Highway Investigation
Hart & Hickman contracted IET for a large-scale NCDOT highway project involving continuous soil sampling across multiple site locations. The project required meticulous utility clearance, decontamination protocols, and surface restoration.
55
Soil Borings
550 ft
Total Depth
Project Requirements
Safety & Clearance
- • Hand auger each boring to 5 ft to clear utilities
- • Equipment decontamination between each boring
- • Spread cuttings and decon water on-site
Surface Restoration
- • Abandon borings with bentonite grout
- • Patch with asphalt or concrete to match existing surface
- • Varies by location: 5-10 borings per site
Project Information
Client
Hart & Hickman, PC (Job No. ROW-803)
Duration
January 22-25, 2024 (4 days)
Equipment
DPT rig with geoprobe capabilities
Total Cost
$9,272