NCDOT New Hope Road Project

North Carolina
January 2024
NCDOT Highway
Major Highway Investigation

Hart & Hickman contracted IET for a large-scale NCDOT highway project involving continuous soil sampling across multiple site locations. The project required meticulous utility clearance, decontamination protocols, and surface restoration.

55
Soil Borings
550 ft
Total Depth
Project Requirements

Safety & Clearance

  • • Hand auger each boring to 5 ft to clear utilities
  • • Equipment decontamination between each boring
  • • Spread cuttings and decon water on-site

Surface Restoration

  • • Abandon borings with bentonite grout
  • • Patch with asphalt or concrete to match existing surface
  • • Varies by location: 5-10 borings per site
Project Information

Client

Hart & Hickman, PC (Job No. ROW-803)

Duration

January 22-25, 2024 (4 days)

Equipment

DPT rig with geoprobe capabilities

Total Cost

$9,272