888-721-8283

Service Cleaners Interior Drilling

Charlotte Area, NC
January 2024
Dry Cleaning Facility
Interior & Exterior Investigation

Hart & Hickman contracted IET for a comprehensive assessment requiring both interior building sampling and exterior permanent well installation. The project demanded specialized interior drilling capabilities with hand auger clearance and concrete coring.

Soil Borings

8 borings

Interior borings: 5-7 ft depth

Permanent Wells

3 wells

2" diameter, ~35 ft depth

Technical Approach

Well Construction

  • • 2" PVC screens and riser (10-15 ft screen length)
  • • Well depth: ~35 feet below grade
  • • 2' x 2' concrete well pads
  • • Full well development performed

Interior Work

  • • Hand auger 5 feet per boring location
  • • Concrete coring as needed for interior access
  • • Equipment decontamination between all locations
  • • IDW containerized in 9 drums
Project Information

Client

Hart & Hickman, PC (Job No. DSO.183A)

Duration

January 16-18, 2024 (3 days)

Well Material

110 linear feet total

Total Cost

$10,942