Cranberry Township Multi-Area ISCO
Cranberry, PA
June 2010
Persulfate/ZVI/Hâ‚‚Oâ‚‚
Project Overview
Large-scale chemical oxidation program utilizing persulfate and ZVI-catalyzed oxidation across three distinct treatment areas with dual-interval injection strategy.
Treatment Areas
Area A
- • 21 injection points
- • Two injection intervals
- • 2,100 lbs ZVI
- • 4,641 lbs persulfate
- • 185.2 gal H₂O₂ (35%)
Area B
- • 42 injection points
- • Two injection intervals
- • 2,100 lbs ZVI
- • 6,972 lbs persulfate
- • 265.2 gal H₂O₂ (35%)
Area C
- • 7 injection points
- • Two intervals
- • 175 lbs ZVI
- • 1,162 lbs persulfate
- • 39.65 gal H₂O₂ (35%)
Project Totals
4,375 lbs
Total ZVI
12,775 lbs
Total Persulfate
490 gal
Total Hâ‚‚Oâ‚‚ (35%)
Project Details
Client
Environmental Consulting Firm
Location
Cranberry Township, PA 16066
Completion Date
June 2010
Technology
Persulfate/ZVI/Hâ‚‚Oâ‚‚ ISCO
Total Injection Points
70 points