Cranberry Township Multi-Area ISCO

Cranberry, PA
June 2010
Persulfate/ZVI/Hâ‚‚Oâ‚‚
Project Overview

Large-scale chemical oxidation program utilizing persulfate and ZVI-catalyzed oxidation across three distinct treatment areas with dual-interval injection strategy.

Treatment Areas

Area A

  • • 21 injection points
  • • Two injection intervals
  • • 2,100 lbs ZVI
  • • 4,641 lbs persulfate
  • • 185.2 gal Hâ‚‚Oâ‚‚ (35%)

Area B

  • • 42 injection points
  • • Two injection intervals
  • • 2,100 lbs ZVI
  • • 6,972 lbs persulfate
  • • 265.2 gal Hâ‚‚Oâ‚‚ (35%)

Area C

  • • 7 injection points
  • • Two intervals
  • • 175 lbs ZVI
  • • 1,162 lbs persulfate
  • • 39.65 gal Hâ‚‚Oâ‚‚ (35%)
Project Totals

4,375 lbs

Total ZVI

12,775 lbs

Total Persulfate

490 gal

Total Hâ‚‚Oâ‚‚ (35%)

Project Details

Client

Environmental Consulting Firm

Location

Cranberry Township, PA 16066

Completion Date

June 2010

Technology

Persulfate/ZVI/Hâ‚‚Oâ‚‚ ISCO

Total Injection Points

70 points