Utility Easement Geotechnical Borings — Texarkana, TX
At a Glance
Site Challenge
A utility easement in Texarkana required geotechnical borings in terrain suited to a lightweight, all-terrain rig, with site-specific safety training.
Method
ATV-mounted drill rig advancing sixteen 50-foot borings by wash rotary drilling.
Quantities
Borings
16
Depth each
50 ft
Rig days
6
Safety training
2 sessions
Observed Result
IET completed the program over six rig days between July 8 and July 14, 2026.
Limits & Caveats
Soil and rock conditions encountered are not part of the project record. Results belong to the client.
Related Services & Regional Pages
Scope
16 borings to 50 ft
Rig Days
6 (ATV rig)
Contract Value
$24,600.00
Project Overview
IET completed sixteen geotechnical borings to 50 feet along a utility easement in Texarkana, Texas for TTL (project 250902571.00). The program used an ATV-mounted drill rig and wash rotary drilling.
Site-specific safety training was required and completed for the crew before drilling began.
Scope of Work
- Sixteen (16) geotechnical borings to 50 ft
- Wash rotary drilling with an ATV drill rig
- Six rig days with crew per diem
- Site-specific safety training (2 sessions)
Project Details
Client
TTL — San Antonio, TX
Project Number
250902571.00
Site
Utility easement, Texarkana, TX
Field Dates
July 8–14, 2026
Translate