Speedway EHC/Fe Program
Speedway, IN
September 2013
EHC/Fe Technology
BTEX Remediation
IET designs and implements remediation for benzene, toluene, ethylbenzene and xylenes in soil and groundwater at former gas stations, fuel terminals and petroleum release sites.
Enhanced Hydrogen Release
An environmental engineering firm contracted IET for an enhanced reductive dechlorination program utilizing long-term organic hydrogen release (EHC) combined with zero valent iron, complete vitamin complex (B2, B12, Red Yeast Rice), and comprehensive nutrient package.
Materials Package
Reactive Compounds
- • EHC: 5,500 lbs hydrogen-releasing compound
- • Zero Valent Iron: 6,589 lbs micro-scale iron
- • Hydrolyzed Kelp: 3,698 lbs organic substrate
- • Calcium Propionate: 5,190 lbs electron donor
Vitamins & Nutrients
- • Vitamin B2 and B12 microbial cofactors
- • Red Yeast Rice natural nutrient amendment
- • Yeast Extract protein and nutrient source
- • Sulfite and nutrient package amendments
Equipment & Labor
- • Geoprobe and operator with injection trailer (8 days)
- • Portable direct push probe for access points
- • Nitrogen pressurized delivery system
Project Details
Client
Environmental Engineering Firm
Location
Speedway, Indiana
Completion Date
September 2013
Duration
8 days on-site
Facility Type
Dry cleaning facility
Technology
EHC/Fe enhanced reductive