Implementation Protocols

Comprehensive field protocols refined through nearly 2,000 successful projects, featuring proprietary injection systems and automated monitoring technology

ISCO Implementation

Step-by-step protocols for in-situ chemical oxidation projects from design through completion

Implementation Phases

Phase 1
Pre-Implementation Planning
  • 1.Review site characterization data and conceptual site model
  • 2.Conduct bench-scale treatability testing if needed
  • 3.Calculate reagent demand using soil/groundwater data
  • 4.Design injection grid spacing (typically 10-20 ft radius of influence)
  • 5.Prepare Health & Safety Plan and Site-Specific Work Plan
  • 6.Obtain necessary permits and regulatory approvals
  • 7.Coordinate site access and utility clearances
  • 8.Schedule pre-injection groundwater sampling
Phase 2
Field Mobilization
  • 1.Mobilize direct push rig or drilling equipment
  • 2.Stage reagents and mixing equipment
  • 3.Establish exclusion zones and safety protocols
  • 4.Conduct pre-injection site meeting
  • 5.Install temporary monitoring points if needed
  • 6.Set up real-time monitoring equipment
  • 7.Verify injection point locations via utility clearance
Phase 3
Injection Execution
  • 1.Mix reagents to specified concentrations (e.g., 40% NaMnO4, 15% persulfate)
  • 2.Use direct push equipment (Geoprobe 7720DT, AMS 9600/9700 series)
  • 3.Advance probe to target depth intervals (typically 2-5 ft intervals)
  • 4.Inject reagent solution at controlled pressure/flow rate (<150 psi)
  • 5.Monitor injection pressure and refusal conditions
  • 6.Document injection volumes and depths per location
  • 7.Use expendable, retractable, or sealed pressure-activated injection points
  • 8.Collect soil cores for visual confirmation of reagent distribution
  • 9.Measure oxidant residuals in observation wells
  • 10.Real-time flow monitoring with pulsation dampeners for accurate measurement
  • 11.Adjust injection parameters based on field observations
Phase 4
Post-Treatment Monitoring
  • 1.Collect post-injection groundwater samples (2-4 weeks)
  • 2.Analyze for target contaminants and geochemical parameters
  • 3.Monitor oxidant residuals and pH
  • 4.Evaluate treatment effectiveness vs. cleanup goals
  • 5.Conduct quarterly monitoring for 12-24 months
  • 6.Perform additional injections if needed
  • 7.Prepare completion report and closure documentation
Key Implementation Parameters
  • •Reagent type and concentration (e.g., 40% NaMnO4, 10-20% persulfate)
  • •Injection spacing: 10-20 ft radius of influence
  • •Soil oxidant demand (SOD): typically 5-7.5 g/kg for NOM
  • •Natural Organic Matter (NOM) demand via TCLP testing
  • •pH adjustment requirements for persulfate activation
  • •Injection pressure limits: <150 psi for most formations
  • •Target oxidant residuals: maintain first-order kinetics
  • •Swag factor: typically 2x calculated demand for field conditions
Health & Safety Requirements
  • ⚠PPE: Tyvek suits, chemical gloves, safety glasses, respirators if needed
  • ⚠Heat stress monitoring for activated persulfate
  • ⚠Vapor monitoring during injection
  • ⚠Emergency response procedures for spills
  • ⚠Decontamination procedures

Quality Control & Assurance

Pre-Treatment QC
  • Verify site characterization data accuracy
  • Confirm reagent specifications and quality
  • Calibrate injection equipment
  • Conduct pre-treatment site inspection
  • Review and approve health & safety plan
During Treatment QC
  • Real-time monitoring of injection parameters
  • Field measurements (pH, ORP, temperature)
  • Visual observations and photo documentation
  • Daily progress reports
  • Equipment performance checks
Post-Treatment QC
  • Collect representative verification samples
  • Third-party laboratory analysis
  • Data validation and quality review
  • Compare results to cleanup goals
  • Statistical analysis of treatment effectiveness

Need Technical Support?

Our field engineers provide on-site technical support and training to ensure successful project implementation