Irving Geotechnical Study
Alpha Testing contracted IET for detailed geotechnical investigation with comprehensive sampling protocols including continuous Shelby tubes and TCP testing.
- • 200 linear feet of soil boring (0-40 ft range)
- • Continuous Shelby tubes included in top 10 feet
- • 13 TCP tests (included in top 10 feet)
- • 5% early payment discount applied
Client
Alpha Testing Inc (Project# G233634)
Project Manager
Blain Lehman
Completion Date
December 28, 2023
Sales Representative
Randall Cutter
Related Drilling Projects in Dallas–Fort Worth
Parvin Rd — Prosper, TX
40 geotechnical soil borings to 20 feet for UES, 800 total feet.
Read Case Study
McKinney, TX
Geotechnical borings supporting a foundation investigation.
Read Case Study
Little Elm, TX
Three borings to 30 feet with TCP/SPT testing and NQ rock coring.
Read Case Study
Lewisville, TX
Environmental site assessment drilling.
Read Case Study
Dallas, TX
Soil borings and monitoring well installation.
Read Case Study
Dallas Love Field, TX
Airport geotechnical borings totaling 70 feet with TCP/SPT testing.
Read Case Study
Hurst, TX
Direct push technology investigation and injection.
Read Case Study
Fort Worth, TX
Barge drilling and NQ rock coring from a marine platform.
Read Case Study
Waco, TX
Marine barge drilling for a waterway crossing.
Read Case Study