Barge Drilling Investigation — Waco, TX
Scope
3 Borings to 80 ft — Barge Platform
Field Period
May 18–29, 2026 (7 barge days)
Contract Value
$107,412.00
Project Overview
IET executed a specialized barge drilling investigation at Waco, Texas for HVJ Associates (Proj# DG23-10037.1), managed by PM Preston Mee. The program required full crane and barge mobilization, with three (3) deep borings drilled to 80 feet from the barge platform over 7 operational days.
Barge mobilization and crane/barge setup was completed May 18–19, with barge boring B-5 work executed May 20–22 and May 26–29. The project included comprehensive marine insurance for the full project duration.
This project demonstrates IET's unique capability to deploy fully equipped barge drilling platforms for over-water investigations — a critical service for bridge, dam, waterway, and infrastructure projects across Texas where conventional land-based drilling is not feasible.
Scope of Work
- Three (3) borings to 80 feet depth from barge platform
- Full crane and barge mobilization/setup (May 18–19)
- 7 barge/crew operational days at $9,250/day
- Marine insurance coverage for full project duration
- Boring B-5 completed over multiple operational days (May 20–29)
- Managed by PM Preston Mee | Sales Rep: Brad Eskue
Project Details
Client
HVJ Associates North TX — Dallas, TX 75247
Site
Barge Drilling — Waco, TX
Project Number
DG23-10037.1
IET Sales Rep
Brad Eskue
Project Manager
Preston Mee
Number of Borings
3
Boring Depth
80 feet (water-based)
Barge Days
7 operational days