Barge Drilling Investigation — Waco, TX
Scope
3 Borings to 80 ft — Barge Platform
Field Period
May 18–29, 2026 (7 barge days)
Contract Value
$107,412.00
At a Glance
Site Challenge
Over-water geotechnical investigation requiring deep borings from a floating platform on the Brazos River in Waco, TX — conventional land-based drilling not feasible for bridge/foundation target locations. Riverine environment with current velocity and seasonal flow variations affecting barge stability.
Method
Barge-mounted drilling platform with crane support and full marine insurance. Rotary drilling with casing through unconsolidated alluvial sediments (sand, gravel, silt, clay) into underlying Cretaceous limestone and shale. IET operates its own barge drilling program — no subcontracting — including crane mobilization, anchoring, and experienced marine crews.
Quantities
Borings
3 to 80 ft
Barge Days
7 days
Day Rate
$9,250/day
Contract Value
$107,412
Observed Result
All three deep borings successfully completed to 80 feet from the barge platform over 7 operational days. Full marine insurance coverage (including pollution liability) maintained throughout. Multi-day boring B-5 operation required careful barge positioning and stabilization.
Limits & Caveats
Barge drilling subject to water depth, current velocity, and seasonal flow variations. Higher cost than land-based drilling ($9,250/day) due to specialized equipment, crew, and marine insurance requirements. Limited to accessible waterways with suitable launch/mobilization points.
Related Services & Regional Pages
Project Overview
IET executed a specialized barge drilling investigation at Waco, Texas for HVJ Associates (Proj# DG23-10037.1), managed by PM Preston Mee. The program required full crane and barge mobilization, with three (3) deep borings drilled to 80 feet from the barge platform over 7 operational days.
Barge mobilization and crane/barge setup was completed May 18–19, with barge boring B-5 work executed May 20–22 and May 26–29. The project included comprehensive marine insurance for the full project duration.
This project demonstrates IET's unique capability to deploy fully equipped barge drilling platforms for over-water investigations — a critical service for bridge, dam, waterway, and infrastructure projects across Texas where conventional land-based drilling is not feasible.
Scope of Work
- Three (3) borings to 80 feet depth from barge platform
- Full crane and barge mobilization/setup (May 18–19)
- 7 barge/crew operational days at $9,250/day
- Marine insurance coverage for full project duration
- Boring B-5 completed over multiple operational days (May 20–29)
- Managed by PM Preston Mee | Sales Rep: Brad Eskue
Project Details
Client
HVJ Associates North TX — Dallas, TX 75247
Site
Barge Drilling — Waco, TX
Project Number
DG23-10037.1
IET Sales Rep
Brad Eskue
Project Manager
Preston Mee
Number of Borings
3
Boring Depth
80 feet (water-based)
Barge Days
7 operational days
Technical Approach & Methodology
Barge drilling is a specialized marine geotechnical investigation method that deploys a drill rig on a floating platform anchored over water or at the water's edge. The technique is essential for bridge pier foundations, dam investigations, waterfront structural assessments, and contaminated sediment characterization where land-based rigs cannot access the target boring locations. IET operates its own barge drilling program — including crane mobilization, marine insurance, and experienced marine crews — without subcontracting.
For this Waco project, IET mobilized a full barge platform with crane support to advance three (3) deep borings to 80 feet below the water/ground surface. The 7-day barge operation required careful coordination of barge positioning, anchoring, and stabilization to maintain vertical tolerances during drilling. Each boring was advanced using rotary methods with casing to maintain borehole stability through the over-water sediment column and into the underlying formation.
The $9,250/day barge rate reflects the specialized equipment, crew, and insurance costs associated with marine drilling operations. Full marine insurance coverage for the project duration — including pollution liability and equipment coverage — is standard on all IET barge programs and was included in this project's scope. PM Preston Mee coordinated the complex logistics of barge mobilization, crane setup (May 18–19), and the multi-day boring B-5 operation (May 20–29).
Site Conditions & Hydrogeological Context
The Waco, Texas area is situated along the Brazos River within the Grand Prairie physiographic province of Central Texas. The shallow geology consists of Quaternary alluvial terrace deposits (sand, gravel, silt, and clay) overlying Cretaceous-age limestone and shale formations of the Edwards Group and Georgetown Formation. Over-water boring locations in this setting require casing through the soft, unconsolidated alluvial sediments before advancing into the more competent underlying bedrock.
The 80-foot boring depth on this project suggests the investigation targeted foundation conditions for a bridge, dam, or waterfront structure requiring deep bearing strata characterization. Barge drilling in riverine environments like the Brazos River requires careful attention to current velocity, water depth, and seasonal flow variations that can affect barge stability and drilling operations. IET's marine drilling experience across Texas waterways — from bridge investigations to contaminated sediment programs — ensures safe and productive field execution under these conditions.