888-721-8283

Well Development & Sampling

Professional monitoring well development and groundwater sampling — low-flow micropurge sampling, quarterly monitoring programs, and post-remediation performance assessment with complete regulatory documentation.

Applications

  • New monitoring well development after installation
  • Periodic groundwater sampling for long-term monitoring
  • Low-flow sampling for VOC and SVOC analysis
  • Purge-and-bail sampling for regulatory compliance programs
  • Post-remediation performance monitoring sampling
  • Quarterly and annual groundwater monitoring programs
  • Remediation system performance groundwater sampling
  • Phase II ESA groundwater sampling programs

Key Advantages

  • Low-flow micropurge sampling minimizes waste and sample disturbance
  • Field parameters measured in real-time (pH, ORP, DO, conductivity)
  • Portable peristaltic and bladder pump systems available
  • Full chain-of-custody documentation for regulatory submittals
  • Experience with all major state and federal sampling protocols
  • Sampling integrated with drilling for one-mobilization efficiency

About Well Development & Sampling

Proper well development is critical to obtaining representative groundwater samples. After installation, IET develops monitoring wells using surge-and-bail, pumping, or airlifting methods to remove drill cuttings and fine sediment from the filter pack — ensuring the well yields clear, representative groundwater samples. Field parameters including pH, ORP, dissolved oxygen, temperature, and specific conductance are measured during purging to confirm stabilization prior to sample collection.

IET's groundwater sampling programs follow low-flow micropurge protocols where required, minimizing purge volumes and sample disturbance for accurate VOC analysis. All samples are collected with proper chain-of-custody documentation and delivered to certified analytical laboratories. IET supports quarterly, semi-annual, and annual monitoring programs as part of long-term site monitoring requirements and post-remediation performance assessment.

Project Photos

IET groundwater sampling crew collecting low-flow sample from monitoring wellIET field technician developing monitoring well and collecting groundwater sampleIET well development using surge block and bailer after new monitoring well installationIET environmental crew performing quarterly groundwater monitoring sampling programIET sampling team collecting groundwater samples for TCE and PCE analysis at contaminated siteIET monitoring well network sampling — post-remediation performance monitoring groundwater program
🎶 Get the Anthem Lyrics